Guangzhou Metro Line 11, Guangzhou's first metro circle line, will be put into operation by the end of this year. A trial ride of Line 11 was presented by Guangzhou Metro for the local media on December 19.
The Yuntai Garden Station of Guangzhou Metro Line 11
With a total length of 44.2 kilometers, Line 11 has 31 stations, 26 of which are interchange stations that can interchange with nine existing lines and seven lines planned or under construction in Guangzhou.
The cultural totem of Guangzhou Metro Line 11
The opening of Line 11 will greatly enhance the connectivity of Guangzhou metro network and improve the travel efficiency citywide, which is of great significance to the development of Guangzhou.
Inside of the Pazhou Station of Guangzhou Metro Line 11
Inside of the Pazhou Station of Guangzhou Metro Line 11
Inside of the Pazhou Station of Guangzhou Metro Line 11
Source: Guangzhou Daily
Video & photos: Luo Changwei/Guangzhou Daily
English author & editor: Lyu Yun